Install LYSAGHT BONDEK® steel decking

The construction of LYSAGHT BONDEK® steel decking is a simple, familiar and widely accepted practice. This page details some of the main steps for installation of LYSAGHT BONDEK®.

For detailed installation instructions: Download LYSAGHT BONDEK® Design and Construction Manual ONLY (Member Page) (1.06 MB)

Step 1: Open LYSAGHT BONDEK® sheet bundles LYSAGHT BONDEK® - open sheet bundles
Step 2: Place props if required LYSAGHT BONDEK® - placing props
Step 3: Trim LYSAGHT BONDEK® sheets if required and place LYSAGHT BONDEK® - trimming sheets
Step 4: Fix LYSAGHT BONDEK® sheets to steel beams if required LYSAGHT BONDEK® - fix BONDEK® sheets to steel beams if required
Step 5: Fix steel edgeform LYSAGHT BONDEK® - fix edgeform
Step 6: Cut penetration
Step 7: Place post tensioning and reinforcement LYSAGHT BONDEK® - Place Reinforcement
Step 8: Place concrete
Step 9: Allow slab to cure and remove props LYSAGHT BONDEK® - allow slab to cure, remove props
Step 10: Install services and ceilings with LYSAGHT BONDEK® accessories LYSAGHT BONDEK® - Bon Wedge
Bon Wedge
LYSAGHT BONDEK® - Bon Nut
Bon Nut
LYSAGHT BONDEK® - Post tensioning clip
Post Tensioning Clip
LYSAGHT BONDEK® - Bon Strip
Bon Strip